Fire Protection PE-13
Physical and Environmental Protection · Low baseline ✗ Not implemented
Status — program-wide
What references this control
No risks name this control in their Framework field yet.
No policies reference it yet.
Link a risk or policy to this control
Attaching adds PE-13 to the item's Framework field; the ✨ AI button suggests the best match. You can also edit the Framework field on a risk / policy directly.
Source: NIST SP 800-53 Rev.5, Physical and Environmental Protection family NIST SP 800-53 Rev.5. The baseline shows the lowest SP 800-53B baseline (Low / Moderate / High) this control appears in NIST SP 800-53B.
Control guide — plain-English, per NIST SP 800-53
PE-13 (Fire Protection) is about having fire detection and suppression for the space that holds the system — something that senses a fire and something that helps put it out — backed by its own power source so it still works when the building’s power is gone. It is a Low-baseline Physical and Environmental Protection control.
What good looks like
- Put a smoke or heat detector in or near the space that holds the server, and prefer a battery-backed unit so it still works when the wall power is off.
- Keep a fire extinguisher within reach — a Class C unit is rated for electrical fires, which is what a server rack is.
- Know the two halves: detection means a fire is sensed, suppression means something helps put it out — the control wants both.
- Test and service both on a schedule — detector batteries fade, and extinguishers have inspection dates.
- At Moderate, add detection that activates automatically and notifies people (enhancement PE-13(1)).
Framework mapping
- NIST CSF 2.0 — PR.IR-02 — The organization’s technology assets are protected from environmental threats
How to move it toward Implemented
- Confirm a smoke or heat detector covers the space and that its power is independent (battery-backed); add one if the space has none.
- Place a Class C (electrical-rated) fire extinguisher within reach of the rack and check that its inspection tag is current.
- Write the fire-protection setup and a test/service cadence into a short note (detector test date, extinguisher inspection date).
- Attach that note as hardening evidence on the asset, naming
PE-13in the Requirement field — that moves it from ‘To assess’ toward ‘Completed’.