Emergency Shutoff PE-10
Physical and Environmental Protection · Moderate baseline ✗ Not implemented
Status — program-wide
What references this control
No risks name this control in their Framework field yet.
No policies reference it yet.
Link a risk or policy to this control
Attaching adds PE-10 to the item's Framework field; the ✨ AI button suggests the best match. You can also edit the Framework field on a risk / policy directly.
Source: NIST SP 800-53 Rev.5, Physical and Environmental Protection family NIST SP 800-53 Rev.5. The baseline shows the lowest SP 800-53B baseline (Low / Moderate / High) this control appears in NIST SP 800-53B.
Control guide — plain-English, per NIST SP 800-53
PE-10 (Emergency Shutoff) is about being able to cut power to the system quickly in an emergency — a fire, a flood, a sparking power supply — placing that shutoff where authorized people can reach it, and protecting it so it cannot be flipped off by accident or by someone who should not touch it. It is a Moderate-baseline Physical and Environmental Protection control.
What good looks like
- Know how to cut power fast — a reachable switched PDU (Power Distribution Unit) outlet, a labeled wall switch, or a breaker — without crawling behind the rack.
- Place the shutoff where an authorized person can reach it in a hurry, but not where a passerby trips it.
- Protect it from accidental or unauthorized activation — a guarded switch, a cover, or a spot only staff reach.
- Make sure someone other than you knows where it is and how to use it.
Framework mapping
- NIST CSF 2.0 — PR.IR-02 — The organization’s technology assets are protected from environmental threats
How to move it toward Implemented
- Identify and document the emergency shutoff for the server — a switched PDU outlet, a wall switch, or the breaker number — and exactly where it is.
- Label it clearly, and if it is easy to bump, add a cover or guard so it is not tripped by accident.
- Write a two-line procedure: when to cut power and who is authorized to do it, and share it with anyone who shares the space.
- Attach that shutoff-location note and procedure as hardening evidence on the asset, naming
PE-10in the Requirement field — that moves it from ‘To assess’ toward ‘Completed’.