Alternate Processing Site CP-7

Contingency Planning · Moderate baseline ✗ Not implemented

Status — program-wide

What references this control

No risks name this control in their Framework field yet.

No policies reference it yet.


Link a risk or policy to this control

Attaching adds CP-7 to the item's Framework field; the ✨ AI button suggests the best match. You can also edit the Framework field on a risk / policy directly.

Source: NIST SP 800-53 Rev.5, Contingency Planning family NIST SP 800-53 Rev.5. The baseline shows the lowest SP 800-53B baseline (Low / Moderate / High) this control appears in NIST SP 800-53B.

Control guide — plain-English, per NIST SP 800-53

CP-7 (Alternate Processing Site) is the ability to bring this server’s essential functions back up somewhere else — a second host, a spare machine, or a cloud instance — within a set time when the primary is unavailable. It is not just having the data (that is CP-6); it is having somewhere to run it, with the equipment, agreements, and equal controls in place. It is a Moderate-baseline control.

What good looks like

Framework mapping

How to move it toward Implemented