PlumbTrackLive demoGRC Risk System

← control library

Contingency Training CP-3

Contingency Planning · Low baseline ✗ Not implemented

Status — program-wide

What references this control

No risks name this control in their Framework field yet.

No policies reference it yet.


Link a risk or policy to this control

Attaching adds CP-3 to the item's Framework field; the ✨ AI button suggests the best match. You can also edit the Framework field on a risk / policy directly.

Source: NIST SP 800-53 Rev.5, Contingency Planning family NIST SP 800-53 Rev.5. The baseline shows the lowest SP 800-53B baseline (Low / Moderate / High) this control appears in NIST SP 800-53B.

Control guide — plain-English, per NIST SP 800-53

CP-3 (Contingency Training) makes sure the people with a recovery role actually know how to do it before the day they need to. It is training tied to the job: whoever restores backups, fails over, or declares an outage gets trained when they take the role, again when the system changes, and on a regular refresh after that. It is a Low-baseline control.

What good looks like

Framework mapping

How to move it toward Implemented